Nickel Concentrator

A concrete column supporting the sag mill was in need of significant repairs. Being in the acid splash zone, there was significant concrete contamination and re-bar damage, more than 20% of the steel reinforcement had to be replaced.

Nitoflor PA

Nitomortar F4 Fillers

Embassy Floors

At one of Canberra's diplomatic embassies, 30 years of wear and tear had left the basement and plant room floors in urgent need of repair. The busy floors needed a tough coating solution with a non-slip surface.

Nitoflor PU200

Nitoflor PA

Nitoflor Anti-Slip Grains 41

Nitoseal MS400

Newcrest Mining Bund Remedial Works

At one of the largest gold mines in Australia, acid used in the elution process had led to significant concrete erosion and steel corrosion.  Fosroc's specification delivered a comprehensive repair with multiple layers of long-term protection built in, for both steel and concrete.

Renderoc LA55

Nitocote EP410

Nitoprime Zincrich

Parramatta Aquatic Centre

Superior waterproofing protection was required for the roof and plant room floors at the new Parramatta Aquatic Centre, which is due for completion in 2023.  Polyurea WHE110 was used for waterproofing, and Nitoflor PA topcoat provided a tough industrial finish.

Polyurea WHE110

Nitoflor PA

Middle Head Fortifications

To repair heritage-listed military assets overlooking Sydney Harbour, Renderoc LA55 Plus and Renderoc HB40 Plus were selected for their high resistivity formula. This strategic repair has enabled safe visitation and future protection while retaining heritage values.

Renderoc LA55 Plus

Renderoc HB40 Plus

Nitoprime Zincrich

Nitobond EP

Cosmetics Production Plant

Nitoflor SLX was the solution to create perfect floors for a client seeking 'pharmaceutical grade' hygiene for a 5000 square metre new production plant.

Nitoflor SLX